Logo PSC Member of PECC2

Transportation & Logistics

1000+ KEY INFRASTRUCTURE PROJECTS

40+

Years of experience

1,000+

Infrastructure projects

400+

Power Generation Projects

460+

High-voltage transmission line projects

160+

High-Voltage Substations

FEATURED TRANSPORT & LOGISTICS PROJECTS

SURVEY CAPABILITIES FOR LARGE-SCALE TRANSPORT AND LOGISTICS INFRASTRUCTURE

Building on its survey capabilities across long linear corridors, rivers, marine environments and hard-to-access terrain, PSC has progressively expanded into airports, seaports, roads, bridges, tunnels and logistics hubs.

PSC aims to provide continuous data throughout project stages, supporting the development of modern, safe transport and logistics systems that connect regions.

01

AVIATION

TECHO AIRPORT – CAMBODIA

Techo Airport, Cambodia
2.600 ha
Total project area
4.000 × 60 m
Phase 1 runway
15 million
Passengers/year – Phase 1
50 million
Passengers/year – Phase 3

ICAO 4FAccommodates Airbus A380 and Boeing 747-8

02

SEAPORTS

VINH TAN POWER CENTER SEAPORT

Vinh Tan Power Center Seaport
03
Berths
100.000 DWT
Maximum vessel size
5.0–5.8 million tonnes/year
Cargo handling capacity
  • Vinh Tan 1 Thermal Power Plant Port: 1 berth, 273 m long.
  • Vinh Tan 2 Thermal Power Plant Port: 2 berths, with a total length of 434 m.
  • Vinh Tan 3 Thermal Power Plant Port: 2 berths, with a total length of 445 m.
  • Vessel size: up to 50,000–100,000 DWT.
  • The port includes a navigation channel, a turning basin and coal unloading berths serving the power plants.
03

SEAPORTS

DUYEN HAI POWER COMPLEX SEAPORT

Duyen Hai Power Complex Seaport
427,1 ha
Water area
03
Berths
30.000 DWT
Maximum vessel size
14 million tonnes/year
Port throughput capacity
  • Berth No. 1: 190 m long, accommodating vessels up to 30,000 DWT.
  • Berth No. 2: 200 m long, accommodating vessels up to 30,000 DWT.
  • Berth No. 3: 190 m long, accommodating vessels up to 30,000 DWT.
  • Oil unloading berth: 30 m long, accommodating vessels up to 1,000 DWT.
  • Northern breakwater: approximately 3.9 km long.
  • Port access: an approach channel, berth approach areas and a turning basin.
04

INLAND WATERWAYS

TAN THUAN WIND POWER INLAND WATERWAY TERMINAL

Tan Thuan Wind Power Inland Waterway Terminal

A shared inland waterway terminal serving the various phases of the Tan Thuan Wind Power Project, supporting the transport of equipment, materials and structural components by water; part of the supporting infrastructure for the 100 MW wind power project.

Transport and logistics projects

Underground Petroleum Storage Facility in Nghi Son Economic Zone

PSC’s scope of work: Conducted site selection surveys and provided topographic, geotechnical, and hydrogeological data to support the assessment of construction conditions, layout planning, and design of the underground petroleum storage facility in Nghi Son Economic Zone.

Location
Nghi Son Economic Zone, Thanh Hoa
Year of PSC’s involvement
2010
Client
Vietnam Petroleum Reserves One Member Company Limited
Services
Surveys and testing

Hyosung Cai Mep Petrochemical Complex and Underground LPG Storage Facility

PSC’s scope of work: Conducted geotechnical investigations and provided technical input data for Geostock to prepare the basic design of the underground liquefied petroleum gas (LPG) storage facility within the Hyosung Petrochemical Complex at Cai Mep Industrial Park.

Location
Cai Mep Industrial Park, Ba Ria – Vung Tau
Year of PSC’s involvement
2017
Client
Hyosung Vietnam Co., Ltd.
Underground storage design consultant
Geostock
Services
Surveys and testing
Underground storage scale
Approximately 240,000 tonnes of LPG, with a cavern system nearly 5 km long, located approximately 110–200 m below sea level