40+

Transportation & Logistics
1000+ KEY INFRASTRUCTURE PROJECTS
1,000+
Infrastructure projects
400+
Power Generation Projects
460+
High-voltage transmission line projects
160+
High-Voltage Substations
FEATURED TRANSPORT & LOGISTICS PROJECTS
SURVEY CAPABILITIES FOR LARGE-SCALE TRANSPORT AND LOGISTICS INFRASTRUCTURE
Building on its survey capabilities across long linear corridors, rivers, marine environments and hard-to-access terrain, PSC has progressively expanded into airports, seaports, roads, bridges, tunnels and logistics hubs.
PSC aims to provide continuous data throughout project stages, supporting the development of modern, safe transport and logistics systems that connect regions.
AVIATION
TECHO AIRPORT – CAMBODIA

- 2.600 ha
- Total project area
- 4.000 × 60 m
- Phase 1 runway
- 15 million
- Passengers/year – Phase 1
- 50 million
- Passengers/year – Phase 3
ICAO 4FAccommodates Airbus A380 and Boeing 747-8
SEAPORTS
VINH TAN POWER CENTER SEAPORT

- 03
- Berths
- 100.000 DWT
- Maximum vessel size
- 5.0–5.8 million tonnes/year
- Cargo handling capacity
- Vinh Tan 1 Thermal Power Plant Port: 1 berth, 273 m long.
- Vinh Tan 2 Thermal Power Plant Port: 2 berths, with a total length of 434 m.
- Vinh Tan 3 Thermal Power Plant Port: 2 berths, with a total length of 445 m.
- Vessel size: up to 50,000–100,000 DWT.
- The port includes a navigation channel, a turning basin and coal unloading berths serving the power plants.
SEAPORTS
DUYEN HAI POWER COMPLEX SEAPORT

- 427,1 ha
- Water area
- 03
- Berths
- 30.000 DWT
- Maximum vessel size
- 14 million tonnes/year
- Port throughput capacity
- Berth No. 1: 190 m long, accommodating vessels up to 30,000 DWT.
- Berth No. 2: 200 m long, accommodating vessels up to 30,000 DWT.
- Berth No. 3: 190 m long, accommodating vessels up to 30,000 DWT.
- Oil unloading berth: 30 m long, accommodating vessels up to 1,000 DWT.
- Northern breakwater: approximately 3.9 km long.
- Port access: an approach channel, berth approach areas and a turning basin.
INLAND WATERWAYS
TAN THUAN WIND POWER INLAND WATERWAY TERMINAL

A shared inland waterway terminal serving the various phases of the Tan Thuan Wind Power Project, supporting the transport of equipment, materials and structural components by water; part of the supporting infrastructure for the 100 MW wind power project.
Transport and logistics projects
Underground Petroleum Storage Facility in Nghi Son Economic Zone
PSC’s scope of work: Conducted site selection surveys and provided topographic, geotechnical, and hydrogeological data to support the assessment of construction conditions, layout planning, and design of the underground petroleum storage facility in Nghi Son Economic Zone.
- Location
- Nghi Son Economic Zone, Thanh Hoa
- Year of PSC’s involvement
- 2010
- Client
- Vietnam Petroleum Reserves One Member Company Limited
- Services
- Surveys and testing
Hyosung Cai Mep Petrochemical Complex and Underground LPG Storage Facility
PSC’s scope of work: Conducted geotechnical investigations and provided technical input data for Geostock to prepare the basic design of the underground liquefied petroleum gas (LPG) storage facility within the Hyosung Petrochemical Complex at Cai Mep Industrial Park.
- Location
- Cai Mep Industrial Park, Ba Ria – Vung Tau
- Year of PSC’s involvement
- 2017
- Client
- Hyosung Vietnam Co., Ltd.
- Underground storage design consultant
- Geostock
- Services
- Surveys and testing
- Underground storage scale
- Approximately 240,000 tonnes of LPG, with a cavern system nearly 5 km long, located approximately 110–200 m below sea level