NAM PHAK HYDROPOWER PROJECT – LAOS
PSC takes part in geotechnical construction and foundation treatment at the Nam Phak Hydropower Project within its assigned scope of work.
- 03
- Asphalt core rockfill dams
- 02
- Reservoirs
- 02
- Hydropower plants
- 03 asphalt core rockfill dams (ACRDs), ranging from 50 to 80 m in height.
- 02 reservoirs and 02 hydropower plants operating as an integrated system.
- Asphalt core dam technology requires stringent material specifications, seepage control and foundation stability.
- Earth and rock excavation, approximately 3.20 million m³.
- Earth and rock fill, approximately 4.57 million m³.